POKKA® 20M HDMI Cable HIGH SPEED Long Lead With Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible With (PS4/Xbox/One/Sky/HD/TV/Laptop/PC/Monitor/CCTV) (Black & Gold Plated)

POKKA® 20M HDMI Cable HIGH SPEED Long Lead With Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible With (PS4/Xbox/One/Sky/HD/TV/Laptop/PC/Monitor/CCTV) (Black & Gold Plated)

62.99 AED-14%
Lowest price ever!
Out of Stock

Price drop alerts are temporarily disabled for Amazon products.

Low

63 AED

Average

66 AED

High

73 AED

Price history chart is temporarily unavailable for Amazon products.

    POKKA® 20M HDMI Cable HIGH SPEED Long Lead With Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible With (PS4/Xbox/One/Sky/HD/TV/Laptop/PC/Monitor/CCTV) (Black & Gold Plated) — Price History & Tracker | DeserTracker